Hectic days at SOENEN – April 2009
The month of April promises to be a hectic period in Roeselare
since 4 lines will be ready for pre-acceptance at the same time.
The workshop is fully occupied by new installations for customers
in the transformer and perforating business. During this hectic
period all punching lines are shifted to the workshop in Estampuis.
Following lines are (almost) ready for pre-acceptance: a 250T
perforating press for Richardson Shanghai, a slitting line for TBEA
Hengyang Transformer Co. Ltd, a core cutting line for Iljin
Electric Co., Ltd. and an exclusive high speed core cutting line
for ABB Hefei Transformer Co., Ltd.



